Nebo Allen M. Torres
Geodetic Engineer / Surveyor
Profile

Nebo Allen M. Torres
Geodetic Engineer / Surveyor
Licensed Geodetic Engineer (1ˢᵗ Place, Philippine Professional Regulation Commission Licensure Examination – September 2007) with over 15 years of international experience in land and construction surveying, spanning both field and office environments. Experienced in delivering precise fieldwork, calculations, survey deliverables and project management while leveraging automation, programming, and data integration to optimize workflows, enhance accuracy, and streamline reporting. Successfully contributed to multibillion-dollar iconic projects for major international construction companies.
Key Expertise:
- Land & Construction Surveying (Fieldwork, Calculations, Project Management)
- Geodetic Engineering & Control Networks
- Autodesk AutoCAD Civil 3D Drafting and Modeling
- 12D Model Chain and Macro Automation
- Leica Cyclone 3DR (Point Cloud Processing)
- MS Excel VBA, Power Query, and PowerBI Automation
- Web Scraping, Data Extraction, and HTML Parsing
- Mobile & Desktop Application Development
Resume
Resume
EMPLOYMENT HISTORY
Jun 2025 - Present
Project:Stations, Systems, Trains, Operations and Maintenance (SSTOM); Western Sydney Airport Metro Project, Sydney, Australia
Character Reference:
Abdullah Al-Mouhajer <[email protected]> Survey Data Manager
Survey Data Management
- Streamline survey department workflows through automation using 12D Model macros and chains, MS Office tools, and Leica Cyclone 3DR scripts.
- Automate earthworks volume calculations for landscaping and pavement, improving accuracy and operational efficiency.
- Generate design surfaces, meshes, and TINs for site use, supporting precise fieldwork.
- Develop Power BI dashboards and reports to enable real-time insights, streamline data analysis, and support informed decision-making.
Sep 2022 - Jun 2025
Project: M6 Stage 1 Motorway, Sydney, Australia
Character Reference:
Matthew Williams <[email protected]> Technical Director
Tunnel Excavation
- Managing and Controlling Survey Documentation to Statutory Authorities (TfNSW) and Project Guidelines.
- Providing expert advice on survey tasks.
- Scanning and Point Cloud Processing for Tunnel Models.
- Automate Workflows by creating 12D Macros and Leica Cyclone 3DR Scripts.
- Control and Level Run.
- Monitor prism arrays inside the tunnel in a high precision manner.
- Calibrate RoadHeaders and RoboDrills.
- Setup VMT Guidance System (Total Station, Central Box, TUnIS Navigation Office, XML Files, etc.)
- Troubleshoot Network problems between the Guidance System and RoadHeaders + RoboDrills.
- AsBuilt Tunnel Elements (Excavation – roof, wall and bench, Shotcrete layers, Strip Drains, etc.)
- Set-out Tunnel Elements (services pin holes, gridlines, fresh air vent bag knocker lines, etc.)
Final Lining
- Automate Reporting Workflows by creating MS Excel and 12D Macros.
- Calculate and Generate Final Lining Checker for Engineers to review.
- Calculate and Generate Points with Waviness and Thickness Criteria.
- Calculate and Generate Section Plots.
- Maintain, Debug and Optimize Macro used for calculations.
- Calculate and Generate Points and Trimeshes for Cutting Pins Set-out.
- Maintain and Update Final Lining Database (12D and 3DR)
- Delegate Daily task to Site Surveyors.
- Coordinate with Site Surveyors, Site Supervisors and Engineers.
- Create PowerBI Dashboard and Report to streamline data analysis, provide real-time insights, and enhance decision-making for the team.
SURVEY RELATED APPS
PROGRAMMING
GRAPHICS DESIGN
VPS WEBSITE DEPLOYMENT
PRC BOARD EXAM RATING
LANGUAGES
Jun 2020 - Jul 2022
Project: WestConnex M4-M5 Link Tunnels Project, Sydney, Australia
Character Reference:
Aaron Williams <[email protected]> LS Director
Tunnel Excavation
- Establish Control Points.
- Monitor prism arrays inside the tunnel in a high precision manner.
- Calibrate RoadHeaders and RoboDrills.
- Setup VMT Guidance System (Total Station, Central Box, TUnIS Navigation Office, XML Files, etc.)
- Troubleshoot Network problems between the Guidance System and RoadHeaders + RoboDrills.
- AsBuilt Tunnel Elements (Excavation – roof, wall and bench, Shotcrete layers, Strip Drains, etc.)
- Set-out Tunnel Elements (services pin holes, gridlines, fresh air vent bag knocker lines, etc.)
Back-End Works
- Set-out Tunnel Elements.
- AsBuilt Tunnel Elements.
Jan 2016 - Dec 2018
Project: BACS Riyadh Metro Project, Riyadh, KSA
Character Reference:
Eduardo B. Dela Cruz <[email protected]> Bechtel Field Engineering
Roberto D. Lopez <[email protected]> Bechtel Field Engineering
Cast-in-Place Balanced Cantilever
- Establish Control Points.
- Calculate 3D Survey data needed for site works.
- Set-out site elements like Centerlines, Temporary Openings and Ducting.
- Calculate Cambered Elevations for individual spans.
- Discuss with Site Engineers the site plans and operations.
Segment Erection
- Process Survey Work Request.
- Calculate and prepare Cambered as-cast data coordinates for site surveyors alignment work.
- Create AutoCad Sketch and Plan for AsBuilt and Verification purposes.
- Process Span Final Alignment report in Autocad and Excel Spreadsheet.
- Create and maintain Span Alignment Database.
- Manage survey crew for 5 Launching Gantry in dayshift and nightshift.
PreCast Yard
- Automate Survey data processing by making MSExcel programs and tools.
- Weekly Calibration of Total Stations (Trimble S8).
- Process Survey Work Request.
- Conduct pre-pour Alignment Survey of Segments to be Casted by using Total Station and Digital Level.
- Prepare pre-pour Survey Reports for transmittal.
- Create and maintain casted segments Database. With pivot table, graphs and projection.
- Act as a Lead Surveyor in absence of the Lead Surveyor.
- Follow always the Health, Safety and Environment (HSE) rules carefully and making sure that the working place is safe.
Dec 2013 - June 2015
Project: King Abdulaziz Center for World Culture(KACWC), Dhahran, KSA
- Manage and supervise other survey teams, give them daily
instructions and task to be executed in the site with the approval of the Construction Manager.
KACWC
- Establish Survey Methodology.
- Make calculator programs needed for site survey calculations.
- Automate Survey data processing by making Excel programs and tools.
- Establish and monitor 3-dimensional control points for the project site using Leica Geo Office software.
- Extract data coordinates from AutoCAD and Rhino files for site setting-out.
- Prepare Survey Reports for transmittal.
- Joint Survey with other contractor’s survey department.
- Follow always the Health, Safety and Environment (HSE) rules carefully and making sure that the working place is safe during the entire construction period.
Dec 2011 - Dec 2013
Project: King Abdullah Petroleum Studies and Research Center (KAPSARC), Riyadh, KSA
- Manage and supervise other survey teams, give them daily instructions a
nd task to be executed in the site with the approval of the Construction Manager.
- Establish Survey Methodology.
- Make calculator programs needed for site survey calculations.
- Automate Survey data processing by making Excel programs and tools.
- Establish and monitor 3-dimensional control points for the project site using Leica Geo Office software.
- Extract data coordinates from AutoCAD and Rhino files for site setting-out.
- Prepare Survey Reports for transmittal.
- Joint Survey with other contractor’s survey department.
- Follow always the Health, Safety and Environment (HSE) rules carefully and making sure that the working place is safe during the entire construction period.
Fortune Pacific General Contracting
Survey Engineer / Land Surveyor
Jul 2010 - Mar 2011
Project: St. Regis Beach Resort Saadiyat Island, Abu Dhabi, UAE
Client: Warner Land Surveys Ltd.
- Establish horizontal and vertical control points for the project site.
- Setting-out of various points, gridlines and elevations needed on the site.
- As-built survey for the coordinates and elevations of existing structures�and processing the data to create an updated As-built drawing for future reference.
- Extract data (coordinates and elevations) from CAD files for setting-out.
- Download and upload, import and export survey data from survey instrument to personal computer or other way around. And counter checking of survey data calculation in compliance to project drawings and specifications prior to concreting.
- Check the survey instruments like TOTAL STATION, GPS, and LEVELLING INSTRUMENT, etc. following with the standard accuracy. Verifying the collimation and instrument calibration from time to time.
- Follow always the HSE (Healthy and Safety Environment) rules carefully and making sure that the working place is safe during the entire construction period.
- Follow a Systematic Method of obtaining data and using only updated specification and latest revision drawings. (Wrench Enterprise)
- Double check the drawings before executing, if any comments found, cross check with all relevant (structural, architectural, setting out plans) drawings and finalized the correct one with the concern higher authorities.
- Topographic surveying with contour, area and volume (cut and fill) calculations using Surveying Software (LisCad, Autodesk AutoCAD Land Desktop 2009 and Autodesk AutoCAD Civil 3d 2011).
- GPS Static control points establishment.
- GPS Real Time Kinematic (RTK) setting-out and asbuilt survey.
Fortune Pacific General Contracting
Architectural Site Surveyor
Feb 2010 - Jun 2010
Project: ADNEC Capital Gate Tower Entrance – The leaning tower of Abu Dhabi.
Client: Waagner Biro International
- Establish horizontal and vertical control points in coordination with the structural surveyors.
- Joint survey with the main contractor survey team.
- Extract data (coordinates and elevations) from latest CAD files for setting-out.
- Setting-out of Steel Column base, Steel Beams & Brackets and other elements needed by the installation team.
- Alignment / As-built survey of steel structure, prior to installation of glass.
- Direct report to the Construction Manager.
Fortune Pacific General Contracting
Architectural Site Surveyor
Mar 2009 - Feb 2010
Project: MASDAR Institute of Science and Technology, Abu Dhabi, UAE
Client: Reem Emirates Aluminum (REA)
- Establish horizontal and vertical control points in coordination with the structural surveyors.
- Joint survey with the main contractor survey team.
- Extract data (coordinates and elevations) from latest CAD files for setting-out. Compare embeds and bracket lay-out drawing and make RFIs if necessary.
- As-built survey of slab edge, prior to installation of brackets.
- Mark benchmarks, offset lines on the slab edge for the reference of the bracket and panel installation teams.
- Setting-out of embed and bracket centerlines.
- Check the level and the in/out of the bracket, check the level of the gutter head after panel installation, check the distance from the back of mullion to offset line if it is within allowable tolerance.
- Setting-out of any other elements needed by the installation team.
- Direct report to the Construction Manager.
- Manage other survey teams, give them daily instructions and task to be executed in the site with the approval of the Construction Manager.
ALDAR Laing Rourke Construction LLC UAE
Junior Land Surveyor
Feb 2008 - Mar 2009
Project: ASYMPTOTE TOWER and AL BANDAR (Al Raha Beach Project), Abu Dhabi, UAE
- Establish horizontal and vertical control points for project site.
- Systematic transferring horizontal and vertical control points from one floor to another maintaining the accuracy.
- Setting-out of various points, lines and elevations needed on the site.
- Pre-pour check/verification of line and grade for various structural concrete foundations and embedded items in accordance to design drawing & project specifications.
- As-built survey for the coordinates and elevations of existing structures and processing the data to create an updated As-built drawing for future reference.
- Extract data (coordinates and elevations) from CAD files for setting-out.
- Download and upload, import and export survey data from survey instrument to personal computer or other way around. And counter checking of survey data calculation in compliance to project drawings and specifications prior to concreting.
- Check the survey instruments like TOTAL STATION, GPS, and LEVELLING INSTRUMENT, etc. following with the standard accuracy. Verifying the collimation and instrument calibration from time to time.
- Follow always the HSE (Healthy and Safety Environment) rules carefully and making sure that the working place is safe during the entire construction period.
- Follow a Systematic Method of obtaining data and using only updated specification and latest revision drawings. (Aconex)
- Double check the drawings before executing, if any comments found, cross check with all relevant (structural, architectural, setting out plans) drawings and finalized the correct one with the concern higher authorities.
- Monthly Settlement Monitoring of benchmarks within the site to track changes of elevation within the construction area and make the necessary adjustments.
EDUCATION
Negros Oriental State University (NORSU)
Bachelor Of Science In Geodetic Engineering
June 2002 - March 2007
- 1st PLACE in the Professional Regulation Commission Licensure Examination in Geodetic Engineering (September 2007)
- PROFESSIONAL REGULATION COMMISSION (PRC) License No. 0008069
SUBJECTS | RELATIVE WEIGHT | RATINGS |
---|---|---|
Mathematics | 20 | 89% |
Theory and Practice of Surveying | 20 | 87% |
Geodesy | 20 | 91% |
Laws and Regulations | 20 | 76% |
Cartography | 20 | 91% |
CO-CURRICULAR ACTIVITIES / SCHOLARSHIP
Geodetic Engineering Student Society
President
2006 - 2007
The PYLON (Official Yearbook on NORSU System)
Information Management Head
2005 - 2007
The PYLON (Official Yearbook on NORSU System)
Recipient Of The Pylon Scholarship (5-Year Engineering Course)
2002 - 2007
Geodetic Engineering Student Society
Auditor
2005 - 2006
ROTARACT CLUB OF NORSU
Treasurer
2004 - 2005
Geodetic Engineering Student Society
Business Manager
2004 - 2005
The PYLON (Official Yearbook on NORSU System)
Lay-Out Artist
2003 - 2005
NORSU Student Multi-Purpose Cooperative
Board Member
2003 - 2004
The PYLON (Official Yearbook on NORSU System)
Business Manager
2002 - 2003
CERTIFICATES AND AWARDS
Portfolio
Portfolio
Blog
Blog

Blog Post 1

Blog Post 2 Default Template
Contacts
Contacts
Let’s Keep In Touch
For a quick contact scan the QR code to get all my info