June 2020 - Present
Project: WestConnex M4-M5 Link Tunnels Project, Sydney, Australia
Character Reference:
Tunnel Excavation
Back-End Works
Jan 2016 - Jan 2019
Project: BACS Riyadh Metro Project, Riyadh, KSA
Character Reference:
Cast-in-Place Balanced Cantilever
Segment Erection
PreCast Yard
Dec 2013 - Jul 2015
Project: King Abdulaziz Center for World Culture(KACWC), Dhahran, KSA
KACWC
Jun 2011 - Dec 2013
Project: King Abdullah Petroleum Studies and Research Center (KAPSARC), Riyadh, KSA
Structural Land Surveyor
Jul 2010 - Apr 2011
Project: St. Regis Beach Resort Saadiyat Island, Abu Dhabi, UAE
Client: Warner Land Surveys Ltd.
Architectural Site Surveyor
Feb 2010 - Jun 2010
Project: ADNEC Capital Gate Tower Entrance – The leaning tower of Abu Dhabi.
Client: Waagner Biro International
Architectural Site Surveyor
Mar 2009 - Feb 2010
Project: MASDAR Institute of Science and Technology, Abu Dhabi, UAE
Client: Reem Emirates Aluminum (REA)
Structural Land Surveyor
Feb 2008 - Mar 2009
Project: ASYMPTOTE TOWER and AL BANDAR (Al Raha Beach Project), Abu Dhabi, UAE
Bachelor Of Science In Geodetic Engineering
June 2002 - March 2007
SUBJECTS | RELATIVE WEIGHT | RATINGS |
---|---|---|
Mathematics | 20 | 89% |
Theory and Practice of Surveying | 20 | 87% |
Geodesy | 20 | 91% |
Laws and Regulations | 20 | 76% |
Cartography | 20 | 91% |
President
2006 - 2007
Information Management Head
2005 - 2007
Recipient Of The Pylon Scholarship (5-Year Engineering Course)
2002 - 2007
Auditor
2005 - 2006
Treasurer
2004 - 2005
Business Manager
2004 - 2005
Lay-Out Artist
2003 - 2005
Board Member
2003 - 2004
Business Manager
2002 - 2003